Need GPUs Now?

Tell us who you are and we'll bring up the agreement for you to sign right here.

Size the
deployment

Based on 8-accelerator nodes at nameplate draw. Indicative only.

15.0 kW
45 kW
Contracted power required
1.94 MW
1,920 kW compute plus 17 kW network and management

Accelerators
1,024
Racks at density
44
Distribution pods
1
Nodes per pod
128
1.94 MW across 1 pod
At 45 kW per rack you are in high-density

territory. Hybrid liquid-air or rear-door heat exchangers are typically the practical cooling regime, and a standard hall will usually need to be ruled out rather than assumed.

favcon

Reserve

Place a Capacity
Reservation.

A reservation holds your place in an upcoming power block while the deployment is scoped properly. It is not a binding order, and it is not a quote - it's a queue position, which in constrained markets is the thing that actually runs out.

Note on sizing. Figures are indicative planning numbers based on nameplate draw and do not account for operating-versus-nameplate margin, cooling overhead, network and storage load, or facility-specific redundancy. Available capacity is site-specific and confirmed per deployment.